top of page

FORMS & APPLICATIONS

Must submit a permit fee with all applications and include the following:

 

  • General Liability Insurance Certificate (accord form)

  • Workers Compensation Certificate (U-26.3 state form) (issued by the NYS Insurance Fund)

  • Disability Insurance Certificate

  • Copy of Contractors Nassau County or Town License

 

**ALL CERTIFICATES MUST LIST  “Village of Russell Gardens, 6 Tain Drive, Great Neck, NY 11021” as the Certificate Holder & Additional Insured.

Permit Application Requisites & Forms:

Interior Alterations Only, No Plumbing, No Windows:

PERMIT REQUISITES:

AFTER THE PERMIT, TO CLOSE IT AND OBTAIN THE CERTIFICATE OF OCCUPANCY OR COMPLIANCE. OCCUPYING THE PREMISES WITHOUT A C.ofO./C.ofC. WILL RESULT IN A VIOLATION ON THE BUILDING:

Interior Alterations Only, With Plumbing & No Windows:
Exterior With or Without Interior Alterations. Structural Repairs & Alterations WITHOUT Plumbing, Nor Appliance Replacement:
Exterior With or Without Interior Alterations. Structural Repairs & Alterations With Plumbing and/or Appliance Replacement (HVAC & Generator on a Separate Application):
Re-Roofing & Other Façade Alteration, WITHOUT Any Structural, Nor Window Opening Modifications:

PERMIT REQUISITES:

AFTER THE PERMIT, TO CLOSE IT AND OBTAIN THE CERTIFICATE OF OCCUPANCY OR COMPLIANCE. OCCUPYING THE PREMISES WITHOUT A C.ofO./C.ofC. WILL RESULT IN A VIOLATION ON THE BUILDING:

Window Replacement Only, Without Change in the Header Size or Position:

PERMIT REQUISITES:

AFTER THE PERMIT, TO CLOSE IT AND OBTAIN THE CERTIFICATE OF OCCUPANCY OR COMPLIANCE. OCCUPYING THE PREMISES WITHOUT A C.ofO./C.ofC. WILL RESULT IN A VIOLATION ON THE BUILDING:

Fuel-Fired Appliances Replacement or New. Not for Relocation Except When Together with a Building Permit Application. For Oil-to-Gas Conversions See Also Below:

PERMIT REQUISITES:

AFTER THE PERMIT, TO CLOSE IT AND OBTAIN THE CERTIFICATE OF OCCUPANCY OR COMPLIANCE. OCCUPYING THE PREMISES WITHOUT A C.ofO./C.ofC. WILL RESULT IN A VIOLATION ON THE BUILDING:

Plumbing Fixtures Only. No Relocation of Fixtures Except When Together with a Building Permit Application:

PERMIT REQUISITES:

AFTER THE PERMIT, TO CLOSE IT AND OBTAIN THE CERTIFICATE OF OCCUPANCY OR COMPLIANCE. OCCUPYING THE PREMISES WITHOUT A C.ofO./C.ofC. WILL RESULT IN A VIOLATION ON THE BUILDING:

Oil Tank Abandonment or Removal:

PERMIT REQUISITES:

AFTER THE PERMIT, TO CLOSE IT AND OBTAIN THE CERTIFICATE OF OCCUPANCY OR COMPLIANCE. OCCUPYING THE PREMISES WITHOUT A C.ofO./C.ofC. WILL RESULT IN A VIOLATION ON THE BUILDING:

Generators:

PERMIT REQUISITES:

AFTER THE PERMIT, TO CLOSE IT AND OBTAIN THE CERTIFICATE OF OCCUPANCY OR COMPLIANCE. OCCUPYING THE PREMISES WITHOUT A C.ofO./C.ofC. WILL RESULT IN A VIOLATION ON THE BUILDING:

Air Conditioning (Electrically Operated):

PERMIT REQUISITES:

AFTER THE PERMIT, TO CLOSE IT AND OBTAIN THE CERTIFICATE OF OCCUPANCY OR COMPLIANCE. OCCUPYING THE PREMISES WITHOUT A C.ofO./C.ofC. WILL RESULT IN A VIOLATION ON THE BUILDING:

Signs:

PERMIT REQUISITES:

AFTER THE PERMIT, EVERY YEAR BEFORE JULY 1st:

Tree Alteration:
Demolition (Only for Entire Structure):
Operating Permits:
Tag Sales:
Tax Assessment:
Foil Request:
Landscaper's License:
bottom of page